MRP Production Scrap

https://www.cluedoo.com/web/image/product.template/5163/image_1920?unique=d567960

Define of each BOM the scrap % of the finished product in order to take into account in the component quantity.

US$ 0.00 0.0 USD US$ 0.00 不含增值税

US$ 0.00 不含增值税

Not Available For Sale

    此组合不存在。

    条款和条件
    30天退款保证
    运输:2-3 个工作日

    MRP Production Scrap

    Define of each BOM the scrap % of the finished product in order to take into account in the component quantity.

    US$ 0.00 0.0 USD US$ 0.00 不含增值税

    US$ 0.00 不含增值税

    Not Available For Sale

      此组合不存在。

      STORY BEHIND THE FEATURES 

      ODOO'S FUNCTIONS

      Odoo operates under the default assumption that a finished product is not scrapped. In a Make to Order (MTO) scenario, if you sell 100 units, the system expects the production of 100 finished products and the preparation of components for the entire quantity of 100 finished products. Scrapping is not automatically factored into the default production calculations.

      CLUEDOO'S FUNCTIONS

      The practical reality in many factories often diverges significantly: Scrap percentages for items in the Bill of Materials (BOM) are known, and the goal is to establish a precise BOM that incorporates a designated scrap percentage. In this way, when a production request for 100 units is received, the production order is initiated for 100 units plus the anticipated scrap percentage.


      Cluedoo recognizes and addresses this business scenario by introducing the concept of scrap on the finished product BOM. This feature ensures that the specified scrap percentage is considered in the production order, aligning with the real-world need for accurate production planning that includes anticipated scrap.

      MODULE +

      This module eliminates the need to make a challenging decision between utilizing a BOM where scrap is directly included in the component quantity (resulting in an incorrect BOM) and estimating raw material requirements inaccurately (where the system requests the warehouse to prepare 100kg, but in reality, production needs 110kg). By incorporating scrap on the finished product BOM, it ensures a more accurate representation of the production process, preventing potential errors in both BOM definition and raw material estimation.


      CLUEDOO RECOMMENDATION

      Install in every factory with scrap management. A classic example is plastic injection. 

      OUR FEATURES AS SOLUTIONS

      Scrap Percentage

      HOW TO USE THIS MODULE

      Required module: 

      Production Order Management


      1.

      Set scrap percentage on the Bill of Materials for a product. 


      2.

      When creating a production order, the scrap percentage is set automatically based on selected BoM.
      Scrap Percentage Formula:
      Scrap %= 10%
      Qty to transfer= 20
      Qty to produce= qty to transfer / (1 - scrap percentage)
                               = 20 / (1 - 10%) = 2,22